|
Home | Live Data | Instruments | CHRNS | Proposals |
8/11/03-8/15/03 Installation of Electrical, Chilled Water, and Air
The shield walls are removed from around the NG1 Reflectometer
Electrical power for the ANDR PSD and sample environments
Electrical power for the ANDR Control station, motor control rack and sample environments.
Electrical power for the NG1 Reflectometer
Chilled water and compressed air manifold
Last modified 31-August-2016 by website owner: NCNR (attn: )